There are 8 (eight) nos. of organisations who are engaged in Generation, Transmission and Distribution of Electricity in West Bengal. Those are detailed hereunder.

A) Calcutta Electricity Supply Company, A 100 years old concern run by Private Capital engaged in Generation & Distribution of Electricity in……Square K.M. area of city of Kolkata and suburban areas of Howrah, Hoogly, 24 – Parganas(N), 24 – Parganas(S) Districts having of ….nos. consumers (Domestic, Commercial, & Industrial).

B) National Thermal Power Corporation (N.T.P.C.), A Govt. of India Undertaking, Only Generates Power and some percentage of its generation are sold to W.B.S.E.B. (West Bengal State Electricity Board). Only one power generating station namely Farakka Super Thermal Power Station of this concern is situated in West Bengal having 1630 M.W. installed capacity.

C) Damodar Valley Corporation (D.V.C.). A Govt. of India undertaking engaged mainly in generation of Thermal and Hydro Electric Power. This concern directly sells Electricity to Industries, Coal fields, located in Burdwan District. They also sell Power to W.B.S.E.B. and C.E.S.E. They have installation capacity of 980 M.W. out of which 708 M.W. are sold in West Bengal.

D) Durgapur Projects Limited (D.P.L.), A Govt. of West Bengal undertaking having 390 M.W. installed capacity mainly supplies power in Durgapur Some powers are sold to C.E.S.E. directly.

E) Disergarh Power Station Company (D.P.S.C.), A private concern having 40 M.W. installed capacity mainly sells power to W.B.S.E.B.

F) West Bengal Power Development Corporation Limited (W.B.P.D.C.L.),

Back Ground:-  A Govt. of West Bengal undertaking was formed in 1985 having 2900 M.W. installed capacity of Thermal Power generation. The concern mainly sells power to W.B.S.E.Board and from time to time directly sells power to other states through Power Trading Corporation. Installation of further 710 Mega Watt at Bakreswar and Santaldihi Power Stations is under active process. To generate power efficiently and to generate capital for more power stations this organization was formed dividing W.B.S.E.Board. The dream has partly been successful. Refer Web site http://www.wbpdcl.com.

G) West Bengal State Electricity Distribution Co. Ltd (W.B.S.E.D.C.L), With the introduction Electricity Act’ 2003 W.B.S.E.B. will be dismantled and restructuring of this organisation is under process by Govt. of West Bengal .On ist April 2007 WBSEB has been dismantled and restructuring by two Company. One in the name of 1) West Bengal State Electricity Distribution Co. Ltd (W.B.S.E.D.C.L) and another is 2) West Bengal State Electricity Transmission co. The Govt. of West Bengal has decided both the company under Govt Sector .Now WBSEDCL engaged in generation of Hydro Electricity and Distribution of Power in districts of West Bengal except in the command area of C.E.S.E., D.V.C. & D.P.L. as stated above,  Revenue earning from the consumers  a)  Industrial b)  Commercial c)  Domestic d)  Agriculture e)  Lok Deep (Kutir Jyoti) and also extension & maintenance of Distribution System (LT Net Work) and Sub-station.

 Purulia  Pump Storage Project.

 Back ground:- Pump Storage Project(225 X4=900 Mega Watt – installation capacity)  has been undertaken the work in the Ajadha Hill. The rain water to be storage in the top of the Hill and at the time of discharging the electricity will be generated and the same water will be pumped by the generating unit.  We hope this will help us to a great extent to produce quality Power and load factor of generating stations will also be improved to a handsome quality power.

The Generation of the Pump Storage unit-1 has been started on 13/07/2007 another Units completed on Dec 2007.

Salient features of this Organisation are stated as follows:

  1. Generation Capacity (Hydro Electricity): 164.10 M.W.
  2. Command area: 87000 Sq. Km. out of Total 89,000 Sq. Km.
  3. No. of Consumers :- 8090111(Dec 2011)
    a) Industrial :- 79836
    b) Commercial :- 933372
    c) Domestic :-   6833523
    d) Agriculture :- 103526
    e) Lok Deep & Others :- 139854
  1. 33/11 K.V. Sub. Stn:- 447 Nos.
  2. Distribution:-  33 kv –  8366.77 CKM
  3. 11/6.6 kv – 72550.25 CKM
  4. M&LV –       28675.52 CKM
  5. Revenue Earnings : 2008-09 Rs  9170.71   Cr.

                                           2009-10   Rs   9163.24   Cr.

                                           2010-11    Rs  10261.75 Cr.

9. Revenue Exp : 2008 -09 Rs  8355.80  Cr

                                          2009- 10    Rs  8287.73  Cr.

2010 – 11     Rs  9307.39  Cr.

H) West Bengal State Electricity Transmission co. In the year 2007, Ist April this Company has constituted by the Govt of West Bengal. This company is engaged for extension and maintenance of extra High Voltage & High voltage Line and Sub-station.

10. No. Substations in Transmission System
a) 400 K.V. Sub. Stn :- 3 Nos.
b) 220 K.V. Sub. Stn :- 18 Nos.
c) 132 K. V. Sub. Stn :- 70 Nos.
d) 66 K.V. Sub. Stn:- 8 Nos.

11. Length of Transmission Line
a) High Tension : 400 kv – 1594 CKM
——————–220 kv – 2663 CKM
——————–132 kv – 6707 CKM
——————–66 kv – 497 CKM

Lok Deep Prakalpa was undertaken by Govt. of West Bengal to provide minimum electricity in the huts of down trodden people of West Bengal.

W.B.S.E.B. is a losing concern. Various endeavors are being taken to minimize the losses and such endeavors are being partly successful. With the introduction Electricity Act’ 2003 W.B.S.E.B. will be dismantled and restructuring of this organisation is under process by Govt. of West Bengal. Govt. of West Bengal has decided to manage both Generation and Transmission & Distribution of electricity under Govt. Sector. It is a challenge both to the people of West Bengal and employees of W.B.S.E.B., W.B.P.D.C.L. and D.P.L. whether they will be able to continue to electricity business mainly under state sector fighting back the challenges of private sectors. We are hopeful to meet the challenge successfully.

Generation of Electricity is now in excess in West Bengal and the excess Powers are exported to the other states of the country. But we have some shortfall in peak hour’s demand. We have another problem that we are not fully successful in generating quality electricity and this is mainly for we produce very little quantity of Hydro electricity and our transmission networks are not also up to the mark and to combat the problems.